Zen Follower
- Join Date:
- Mar 2009
- Posts:
- 103
- Plugin Contributions:
- 0
Post #1 by scrap
Hi
I just bought myself a new, faster and better, server onto which I plan to migrate my Zen Cart store. I'm currently running 1.3.8a and of course, I want to upgrade to 1.3.9g.
My initial plan was to migrate my store to the new server (https://www.zen-cart.com/tutorials/index.php?article=100), fiddle with the upgrade to 1.3.9g on the new server, and point my domain to the new server when everything was set.
However, now when I think of it, I'm not sure how to keep my new store in sync with my old, i.e. how to avoid the loss of newly signed up customers and newly added products while I work on the new store. After all, my time frame is like one month...
Knowing that I have two servers (plus an additional locally), what would be the easiest way to do the upgrade? I don't mind rebuilding some parts of the site. In fact, I wouldn't mind rebuilding the whole store as long as my customers and products were transfered.